EVALUATION OF FACTOR AFFECTING FOR LABOUR PRODUCTIVITY IN CONSTRUCTION PROJECT BY AHP

  • Rajen B. Mistry M.E (C. M), S.N.P.I.T & R.C, Umrakh
  • Mr. Vyom B. Pathak civil Engineering Department S.N.P.I.T & R.C
  • Dr. Neeraj D. Sharma civil Engineering Department S.N.P.I.T & R.C, Umrakh
Keywords: Analytical hierarchy process, labour productivity, stake holders.

Abstract

The study aims at identifying the factors affecting labor productivity of Building construction projects in the South Gujarat. . To do so, As per sample size 350 Stakeholders working in construction completed a structured questionnaire survey ranked the identified factors according to analytical hierarchy process.. 40 factors were identified through a detailed literature review. Factors of similar nature were grouped together; giving rise to seven main groups that are: technical, labor, materials, equipments, external &environmental, safety and quality. The analysis of the identified factors indicated that the top ten important factors negatively affecting labor productivity of building construction projects in South Gujarat are: quality inspection delay, working at high places, rework, low quality raw material, lack of material, delay in arrival of material, equipment shortage, lack of labour skill, payment delay

Author Biographies

Rajen B. Mistry, M.E (C. M), S.N.P.I.T & R.C, Umrakh

Student of final year

M.E (C. M), S.N.P.I.T & R.C, Umrakh

Mr. Vyom B. Pathak, civil Engineering Department S.N.P.I.T & R.C

Research Scholar &Assistant Professor

civil Engineering Department

Dr. Neeraj D. Sharma, civil Engineering Department S.N.P.I.T & R.C, Umrakh

HOD &Professor

civil Engineering Department S.N.P.I.T & R.C, Umrakh

Published
2015-06-30
How to Cite
[1]
R. Mistry, M. V. Pathak, and D. N. Sharma, “EVALUATION OF FACTOR AFFECTING FOR LABOUR PRODUCTIVITY IN CONSTRUCTION PROJECT BY AHP”, EPH - International Journal of Science And Engineering (ISSN: 2454 - 2016), vol. 1, no. 2, pp. 07-17, Jun. 2015.